Spring hangers/Spring supports Application | Function | Selection | Qualification | Travel Stop | Adjustment | Installation instruction | Name plate | Details of ordering |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Installation instruction | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Securely attach the hanger to the structure. Turn the turnbuckle until the Variable Spring Hanger or load column of the spring support resp. reaches the desired cold load marking. No other adjustment is necessary. If desired, the Variable Spring Hanger can be delivered locked to the cold load. The travel stops must be removed before the piping is put into operation. To facilitate the installation of the Spring Hangers,
the Spring Hanger body can be provided with installation lugs at extra
cost. |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||